Richmond Civic Center Redevelopment
.png)
.png)
.png)
Project requirements
The City of Richmond required a detailed site survey for the redevelopment of the Richmond Civic Center. The project involved mapping existing site conditions, including structures, utilities, and topography, to support the design and construction of new facilities. The survey needed to ensure accurate integration of the new building layouts with existing infrastructure and address any site-specific challenges.

Scope of Work
The survey covered approximately 10 acres, including public spaces, parking areas, and adjacent streets.
.png)
Technology Used
Advanced surveying equipment, including LiDAR and GPS, was utilized to capture precise data points.

Coordination
Collaboration with city planners, architects, and engineers was essential to align the survey with the overall project goals.

Timeline
The survey was completed within a three-month timeframe, ensuring timely progression to the design phase.

Outcome
Our team completed a precise site survey for the Richmond Civic Center, delivering comprehensive data on existing conditions and utility locations. This information was crucial for the successful design and construction of the new facilities, allowing for seamless integration with the existing infrastructure. The City of Richmond praised the accuracy and efficiency of our work, which helped facilitate a smooth redevelopment process and ensured that the project met its design and operational goals.