Dominion Energy Chesapeake Facility Expansion
.png)
.png)
.png)
Project requirements
Dominion Energy required a detailed site survey to support the expansion of their Richmond facility. The project involved precise measurement and mapping of the existing site, including the location of all structures, utilities, and natural features. The survey needed to account for future building footprints, access roads, utility upgrades, and environmental considerations. The goal was to provide a comprehensive base map to guide the design and construction process while ensuring compliance with local regulations and minimizing disruption to ongoing operations.

Scope of Work
The survey covered key areas of the Richmond facility, including existing buildings, utility lines, and natural features, with particular attention to future expansion zones.
.png)
Technology Used
High-precision tools such as Total Stations and GPS were employed to ensure the accuracy of measurements and mapping.

Coordination
Our team worked closely with Dominion Energy’s engineers and planners to align the survey with the project’s design and operational requirements.

Timeline
The project was completed on schedule, with the survey providing critical data to facilitate the design and construction phases.

Outcome
Our team conducted a thorough site survey, delivering highly accurate and detailed maps of the existing conditions. The survey data was instrumental in optimizing the facility's expansion design, ensuring proper placement of new structures and utilities. Dominion Energy praised the quality and precision of our work, noting that it played a critical role in the successful execution of the expansion project, helping them meet their operational goals while maintaining high standards of safety and efficiency.